Enter a period's work order, hours, downtime and cost figures; the tool calculates common maintenance indicators and compares them with your own targets. Fields you leave empty leave that indicator blank; no industry benchmarks are given.

Free tool · Predictive maintenance

Checking your session…

01

How to use it

  1. A

    Enter a period's work order, labor hours, downtime, operating time, failure and cost figures; indicators for fields you leave empty are not calculated.

  2. B

    Read the planned/unplanned share, PM compliance, MTTR, MTBF, availability and cost ratio from the table.

  3. C

    Optionally enter your own targets to see the gap; copy the result.

02

Which indicators, and why?

The planned maintenance share shows how much of the maintenance team's time goes to pre-planned work and how much to breakdowns. PM compliance shows whether planned jobs are done on time, and the overdue rate shows the backlog.

MTTR summarises how many hours a failure lasts on average, MTBF how many hours the equipment runs between failures, and availability how much of the time the equipment is ready. The maintenance cost to asset value ratio scales spending to the size of the asset base.

03

Care when reading indicators

A single indicator on its own can mislead: a high planned share with low compliance means the plans are not being carried out; high availability with rising cost may mean the equipment gets more maintenance than it needs. Follow indicators together and over time.

The quality of the numbers depends on work order closing discipline. If failure durations and causes are recorded incompletely, MTTR and MTBF lose their meaning. The tool's output is only a summary of the data you enter.

04

How does predictive maintenance affect these indicators?

Vibration, temperature or current monitoring that shows a failure in advance turns unplanned jobs into planned ones: unplanned labor hours fall while the planned share and availability rise and MTTR shortens. To see the effect, compare periods before and after monitoring with the same definitions.

This tool makes no estimate of the effect; entering two separate periods with the same definitions is enough to measure it.

FAQ

What should a good PM compliance rate be?
This tool gives no benchmark. An acceptable rate depends on equipment criticality and organizational policy. Set a reference from your own history, enter your target here and follow the gap.
For MTBF, should I use operating time or calendar time?
In this tool MTBF = operating time / number of failures; enter the time the equipment actually ran. If your organization uses calendar time you can enter that value and calculate the same way, but keep the same definition for comparisons.
What happens if the number of failures is zero?
MTTR and MTBF are undefined and shown as not computed. This means there were no failures in the period; MTBF could be called infinite but no numerical value can be given.
How is the overdue work order rate calculated?
The number of open work orders past due at the end of the period is divided by the total (planned + unplanned) work orders in the period. If your organization also counts work orders carried over from earlier periods, prepare the inputs accordingly.
Can I enter several machines together?
Yes, but the result is an average over the total, not per machine. For a per-machine comparison, enter each machine separately.

Strengthen your indicators with monitoring data

Let's look at which of your unplanned stops gave advance warning and what that does to your indicators.