Predictive Maintenance and Machine Health Analytics
A live health score per machine from vibration, temperature, current and SCADA data; anomaly detection and remaining useful life (RUL) prediction that drive maintenance decisions before a failure occurs.
We tie every machine in the field to a measurable health score. We clean the data flowing from existing sensors and SCADA/PLC logs, learn each machine’s normal behavior and catch deviations without requiring labeled data. Physics-based fault classification (bearing, gearbox, misalignment, electrical) turns an alarm into a maintenance work order, while remaining useful life prediction lets you plan maintenance around the machine’s actual condition rather than the calendar. The result: unplanned downtime and spare parts inventory go down, and the maintenance team gets to the right machine at the right time.
Highlights
- Live health score per machine (0–1)
- Label-free anomaly detection — Isolation Forest, autoencoder
- Physics-based fault classification and root-cause hints
- Remaining useful life (RUL) and recommended maintenance window
- CMMS / ERP work order integration
- 1–48 h
- Warning window before failure
- 90%
- Conformal prediction interval confidence
- 6
- Physics-based fault categories
- 0
- Labeled failure data required (at start)
Capabilities
01
Data Acquisition and Cleaning
Time series ingestion from OPC UA, Modbus, MQTT and SCADA exports; automatic repair of missing and faulty readings, and separation of downtime periods.
02
Health Score and Anomaly Detection
A “normal” envelope learned for each machine; deviations in the vibration spectrum, temperature gradient and load curve are reduced to a single health score, and thresholds are calibrated with operational experience.
03
Fault Classification and RUL
Bearing, gear, misalignment, imbalance and electrical fault categories; a remaining life estimate fitted to the degradation curve, with a 90% confidence interval.
04
Maintenance Decision Loop
Alarm → prioritization → CMMS/ERP work order → feedback. The technician’s findings are written back to the model; the system learns more with every maintenance job.
How we work
Step 01
Sensor and data inventory
Which machine, which signal, which frequency? First data flow from your existing SCADA/PLC within 2 weeks.
Step 02
Learning normal behavior
A per-machine baseline from 4–8 weeks of historical data; thresholds calibrated together with your operations team.
Step 03
Pilot and validation
Live alarms on a selected line or turbine group; every alarm is checked against the technician’s findings.
Step 04
Rollout
CMMS/ERP work order integration, dashboards, a retraining loop and SLA-backed monitoring.
Industries
- Wind Energy
- Production Lines
- Pump & Compressor Fleets
- HVAC & Facilities
Technology
- Python / FastAPI
- scikit-learn / LightGBM
- TimescaleDB
- OPC UA / MQTT
- Grafana
FAQ
- We have no labeled failure history. Can we still start?
- Yes. The system first learns each machine's normal behavior without labels (Isolation Forest, autoencoder) and detects deviations from that baseline. Every technician finding is written back to the model, so fault classification grows stronger with your own data over time.
- Do we need to invest in new sensors?
- Usually not to get started: work begins with your existing sensors and SCADA/PLC records (OPC UA, Modbus, MQTT or exports). If a critical machine lacks a signal, such as vibration, we show where an extra sensor would add value as part of the data inventory.
- When will we see first results?
- The first data flow from your existing SCADA/PLC is set up in about 2 weeks. A per-machine baseline is built from 4–8 weeks of historical data; then a pilot starts with live alarms on a selected line or turbine group, and every alarm is checked against the technician's findings.
- How do alarms reach our maintenance system?
- Alarms are prioritized and become work orders in your CMMS/ERP, together with the fault category (bearing, gear, alignment, imbalance, electrical), a root-cause hint and a maintenance window based on the remaining useful life. Post-maintenance findings flow back into the system.
- How far can we trust the predictions?
- Every prediction comes with a 90% confidence interval rather than a single number, so uncertainty is visible. We tested the approach on open wind turbine SCADA data (ENGIE La Haute Borne); forecast error and interval coverage are published on the case study page of the Wind Power Forecasting and Fault Analysis System project.
Free tool
- OEE calculatorOEE from availability, performance and quality, with a loss waterfall in minutes and the biggest loss item.
- Unplanned downtime cost calculatorThe annual cost of unplanned downtime, potential savings from predictive maintenance and the payback period.
- SCADA data quality checkDrop your SCADA or sensor CSV: gaps, frozen sensors, daylight saving traces and out-of-range values are reported.
- Vibration severity evaluator (ISO 20816-3)Evaluate bearing-housing velocity RMS against ISO 20816-3 zones; mm/s and in/s conversion.
- Bearing fault frequency calculator (BPFO, BPFI, BSF, FTF)Calculate BPFO, BPFI, BSF and FTF from speed and bearing geometry, with harmonics and sidebands.
- Vibration measurement setup and FFT calculatorCalculate sampling frequency, Δf, record length and measurement time from Fmax, lines, window and averaging.
- MTBF, MTTR and availability calculatorMTBF, MTTR, failure rate and availability; from a failure log, with R(t) reliability and series/parallel systems.
- Weibull analysis: β, η and B10 life from failure-time dataWeibull β and η, B10 life, reliability and maintenance interval from failure times; censored data, RRX and MLE.
- Maintenance strategy selectorA simple RCM-based decision flow: strategy suggestion for an asset, reasons, criticality matrix and a CSV list.
- Downtime Pareto analysisPaste downtime causes and durations; Pareto chart, cumulative line, 80% threshold and the causes behind most of the downtime.
- Control chart (SPC) — individuals I-MRIndividuals I-MR control chart: mean, 2.66×MR̄ limits and Nelson / Western Electric rule violations.
- Cp / Cpk process capability calculatorCp, Cpk, Pp, Ppk from measurements and USL/LSL; ppm estimate under normality and a histogram with specification limits.
- Spare part safety stock calculatorSmallest spare stock for a target service level with a Poisson demand model; holding vs downtime cost comparison and a sensitivity table.
- Compressed air leak cost calculatorLeak flow from hole diameter and pressure (orifice flow), yearly kWh and cost; several holes and repair payback.
- Motor efficiency savings calculatorAnnual kWh and cost savings, payback and (with your own factor) CO₂ from motor power, load, hours and the efficiency gain.
- Bearing life L10 calculatorL10 and L10h from dynamic load rating, equivalent load and speed; reliability factor, C needed for a target life and load sensitivity.
- FMEA RPN calculatorRPN = S × O × D for failure modes, ranking, threshold line and Pareto bar chart; high-severity highlight, CSV import and export.
- Maintenance KPI summaryPlanned/unplanned ratio, PM compliance, MTTR, MTBF and availability from work order, downtime and cost counts; comparison with your targets.
- Vibration unit converterConvert acceleration, velocity and displacement units for sine vibration; peak/RMS/peak-to-peak; Hz or CPM; dB level.
- Balance quality grade (ISO 21940) calculatorPermissible residual unbalance e_per and U_per from speed, mass and grade G; split between two planes and correction mass.
- Arrhenius temperature-life estimateAcceleration factor and estimated life from reference and operating temperature and Ea; 10 °C rule comparison and temperature-life curve.
- Risk matrix (likelihood × impact) calculator5×5 likelihood × impact matrix: adjustable band thresholds, risks per cell, a ranked risk list and CSV.
- Belt, pulley and gear ratio calculatorOutput speed, ratio, torque, belt speed and vibration frequencies from diameters or tooth counts; reverse mode finds tooth pairs.
Related notes
All notes →- 3 min readMTBF, MTTR and availability: three numbers, three different questionsMTBF says how often a machine fails, MTTR how quickly it comes back, availability what share of the time the line can produce. We calculate all three from one example, show which decision each one supports, and list the four most common mistakes.
- 3 min readBearing life L10: what it says and what it does not, with load, speed and reliabilityFrom the catalogue dynamic load rating to the basic rating life, then to the reliability and operating-condition adjustment: we calculate a bearing's expected life step by step, show why a small increase in load shortens life so much, and list the questions L10 does not answer.
- 3 min readPareto of downtime causes: 80/20 is not a law, it is a starting pointWe rank one month of downtime records by cause and work out the cumulative share. The example deliberately does not follow 80/20: five of eight causes make up 86.7% of the total. We show how to choose the threshold, how record quality distorts the result, and what comes after Pareto.
- 3 min readThe true cost of unplanned downtime: how to calculate lost hours, repair and the payback of predictive maintenanceThe cost of one stoppage is more than the repair invoice. We walk through lost production hours, repair and a realistic estimate of what early warning saves in one worked example, and show which assumption moves the result most.
- 2 min readGaps and bad records in SCADA data: what to do before modellingTimestamps, gaps, frozen sensors, physically impossible values, curtailment and maintenance periods, sensor replacement: what to check in SCADA data before building a predictive maintenance or power forecasting model.
- 2 min readHow to calculate OEE, and the six most common mistakesThe product of availability, performance and quality; a step-by-step example on a 450-minute shift and six common mistakes that distort the OEE figure.
- 3 min readSPC and Cpk: when a control chart raises an alarm and when a process is capableCalculating I-MR control limits, the logic of the Nelson rules, the difference between control limits and specification limits, and why Cpk can be low in a ten-point example even while the process is in control.
- 2 min readStarting predictive maintenance without labeled failure dataPredictive maintenance does not need a dataset of labeled past failures. Learning normal behavior, linking alarms to a physical fault class and collecting labels along the way is a sound start.
- 3 min readEarly failure warning from vibration data: the ISO 20816 logic and a general approachWhat the vibration severity zones tell you, why you should look at your own baseline and trend rather than a single limit, the acceleration-velocity conversion and common mistakes when setting alarms.
- 3 min readChoosing thresholds for SCADA data quality checks: gaps, frozen values, out-of-rangeCalculating expected record count and coverage from the logging interval, the window length for frozen values, setting physical ranges and how to read the result of a check.
Let’s look at your line or site together.