Risk matrix (likelihood × impact) calculator

Write or paste each risk with a name, a likelihood (1–5) and an impact (1–5). The score is likelihood × impact; set the band thresholds to your own policy. See the number of risks in each matrix cell, the list ranked by score and the risks above the action threshold.

Free tool · Predictive maintenance

Checking your session…

01

How to use it

  1. A

    Paste the risk rows (name; likelihood; impact) or add them from the form; you can also start with the sample data.

  2. B

    Set the band thresholds to your own policy and choose the action threshold.

  3. C

    Read the distribution in the matrix, the list ranked by score and the risks above the threshold; take the list as CSV.

02

What is a risk matrix for?

Maintenance and asset management face many possible failures, and action cannot be taken on all of them at once. A risk matrix scores each risk with two questions: how likely is it, and how large is the impact if it happens? The product of the two helps you rank the risks and choose which to look at first.

A 5×5 structure is a common choice, but point definitions and band names differ in each organization. That is why the tool lets you set the band thresholds yourself.

03

Thresholds and the action threshold

The score ranges from 1 to 25. The low, medium, high and very high bands are separated by three thresholds; the default 4 / 9 / 16 is only an example. The action threshold is the limit above which you say "this should be examined or controls planned", and how many risks stay above it is counted separately.

When you change the thresholds the matrix and the list update at once. The thresholds are checked for consistency: they must be whole numbers, ascending and within 1–24.

04

Scores backed by data

A likelihood score is often a guess. Condition monitoring data such as vibration, temperature or current shows more concretely how likely a failure is and can raise or lower the likelihood score.

For the impact score, map criteria such as downtime, repair cost and safety effect onto a scale defined by your organization, so that different assessors give the same score.

FAQ

How is the score calculated?
Score = likelihood × impact, from 1 to 25. For example a risk with likelihood 3 and impact 5 has a score of 15.
Are the default 4 / 9 / 16 thresholds a standard?
No, they are only an example. Which score counts as low, medium, high or very high is set by your organization's risk policy; change the thresholds as you wish.
What does the action threshold mean?
It is the limit above which risks should be examined or controls taken. The tool shows separately how many risks exceed it. The default is the upper limit of the medium band.
How are risks with the same score ranked?
Among equal scores the one with the higher impact comes first; if still equal, by name. Risks with a large impact but low likelihood are often treated differently from those with high likelihood and small impact.
Can I paste a large list?
Yes; up to 5,000 rows are processed. In Excel select the name, likelihood and impact columns, copy and paste. Unreadable rows are reported with their numbers.

Let's back your risk scores with failure data

Let's look at which assets warn before they fail and what that means for your risk scores and maintenance priorities.